from    
to    
search  

 


Prethermalization and the local robustness of gapped systems
环境学术沙龙第671期:Air Pollution, Climate Change, and Human Health
体外生命系统工程系列讲座(第八期)
Solution synthesis of inorganic nanomaterials Challenges, opportunities,and t...
报告题目:
Network Planning and Pricing for a System with Significant Wind Generation
 报告人:
Furong Li,
教授  Dr. 
英国, University of Bath
报告时间:
2008-11-11 15:30
报告地点:
清华大学西主楼3区102
主办单位:
清华大学电机系电力系统研究所
  简介:

The UK will face the retirement of a considerable number of nuclear power plants (7GW) over next 15 years. Combined with the closure of many coal, oil fired power station to meet EU environmental directives, there will be a generation capacity gap of 20-25GW to meet the continuously rising demand by 2020. Beyond this, the government committed the UK to cutting greenhouse-gas emissions by 80% by 2050, replacing the former target of 60% in an ambitious move to decarbonise the energy sector. This has created a significant challenge for the UK power industry to address this generation gap in a sustainable way.

This presentation provides insight of a number of technical and economic attempts by the presenter to lead the UK towards a low carbon economy. Emphasis will be placed on two fronts: 1) how to plan the transmission network so that the required security and quality standards are not compromised with significant increases in wind generation; 2) how to provide economic incentives to guide the location of future generation/demand and magnitudes of benefits by moving to a more economic pricing model. The presentation aims to disseminate the history, present and the potential future of network planning and pricing in the UK and to provide some enlightment to China.
联 系 人:康重庆 教授

今日相关信息
Microgrids: Supplying Building Energy...
The non-covalent synthesis of supramo...
关于美国和中国专利法的修改
从美国大选看美国的制度和发展
 
同类别相关信息
Web of Science 引文数据库的检索与利用
“中国期刊网”和中文电子期刊检索
图书馆资源与服务导览
清华论坛第19讲:Who will provide he...
馆藏书刊检索与获取
学术活动